Sign UpLogin With Facebook
Sign UpLogin With Google

Shift Scheduling & Staff Availability Poll Templates

Copy-and-launch scheduling polls for weekly rotas, swaps, and overtime—export results instantly.

Paper-cut style illustration depicting staff availability polls with thoughtful design elements and vibrant colors.
Author: Michael Hodge
Published: 11th December 2025

Fill shifts faster with a clear, trustworthy staff availability poll library. Below you’ll find ready-to-use templates for weekly coverage, preferences, overtime, swaps, and holiday rotas. Each question is optimized for quick taps on mobile, balanced answer options, and clean results you can act on. Load any poll into Poll Maker in seconds for free, share instantly, and export responses to finalize your schedule with confidence.

Weekly Availability & Coverage

Start the week strong with a focused shift scheduling poll that captures who can work and when. These quick checks reduce back-and-forth and help you publish a realistic plan on time.

  • When to use these polls: Before publishing a schedule, when staffing changes, or when you need fast confirmation for upcoming days.
  • Best poll types for this section: Multiple-choice, checkboxes for time slots, and Yes/No/Maybe for coverage decisions.
  • How to act on the results: Sort by availability, prioritize critical roles, and document decisions so changes are transparent and repeatable.
Availability Weekly planning

Which shifts can you work next week?

Use this core staff availability poll to capture upcoming coverage at a glance. Load in Poll Maker, share, and export to your rota.

  • Mon AM
  • Mon PM
  • Tue AM
  • Tue PM
  • Wed AM
  • Wed PM
  • Thu Any
  • Fri Any
Coverage Weekend check

Can you cover Saturday?

Quickly confirm weekend coverage so you can lock shifts early and reduce last-minute changes.

  • Yes
  • No
  • Maybe
  • After 2 PM
Availability Sunday window

What is your Sunday availability?

Use this for flexible weekend staffing where partial-day coverage is enough to meet demand.

  • Morning
  • Afternoon
  • Evening
  • Not available
Capacity Weekly hours

How many hours can you commit next week?

Gauge staffing capacity and avoid over- or under-scheduling by aligning hours with team limits.

  • 0–8
  • 9–16
  • 17–24
  • 25–32
  • 33–40
Timing Early starts

Earliest start time you can do next week?

Pin down the earliest reliable start to match opening coverage with real availability. Load instantly into Poll Maker.

  • 6:00
  • 6:30
  • 7:00
  • 7:30
  • 8:00
  • Later only
Location Site flexibility

Are you able to work at another site next week?

Useful for multi-location teams to rebalance coverage without extra hires or overtime.

  • Yes
  • With notice
  • One day only
  • No
  • Something else
Standby Short notice

Can you be on short-notice standby next week?

Build a dependable standby list for unexpected absences or demand spikes and confirm boundaries up front.

  • Yes
  • Weekdays only
  • Weekends only
  • No
  • Prefer not to say
Coverage Break support

Can you extend a shift by 30 minutes for break coverage?

Micro-adjustments like this reduce gaps without rewriting the entire schedule. Results export cleanly for audit.

  • Yes
  • Sometimes
  • No
  • Only with notice

Shift Preferences & Patterns

Give people a voice in their routine with a concise shift schedule poll. Honoring patterns where possible improves morale and reduces swap requests later.

  • When to use these polls: Before new cycles, after policy changes, or when engagement dips and you need fresh input.
  • Best poll types for this section: Single-choice for must-haves, multiple-choice for nice-to-haves, and ranking for priorities.
  • How to act on the results: Identify common preferences, balance fairness with coverage, and communicate the tradeoffs clearly.
Preference Shift type

Which shift do you prefer most?

Set a baseline preference so managers can align people with the times they perform best.

  • Morning
  • Mid
  • Evening
  • Night
  • No preference
Pattern Weekly format

Preferred weekly pattern?

Capture ideal patterns to reduce fatigue and improve predictability for the team and customers.

  • 5×8
  • 4×10
  • 3×12
  • Rotating
  • Something else
Workload Stamina

Max consecutive days you’re comfortable working?

Respecting realistic limits reduces burnout and absenteeism while keeping coverage stable.

  • 3 days
  • 4 days
  • 5 days
  • 6 days
  • Depends
Days Off Recovery

Ideal paired days off?

Align days off where possible to boost recovery while keeping peak windows staffed.

  • Sat + Sun
  • Sun + Mon
  • Fri + Sat
  • Tue + Wed
  • Flexible
Breaks Wellbeing

Preferred main break length?

Match break expectations with operational flow to protect both service and wellbeing.

  • 30 minutes
  • 45 minutes
  • 60 minutes
  • No preference
  • Something else
Commute Travel time

What commute time is acceptable?

Use this to decide fair site assignments and minimize late arrivals due to long travel.

  • < 15 min
  • 15–30 min
  • 30–45 min
  • 45+ min
  • Remote only
Nights Frequency

How often are you willing to work nights?

Clarify night coverage without overloading a small subset of the team.

  • Never
  • Monthly
  • Biweekly
  • Weekly
  • Flexible
Rotation Cadence

Preferred rotation cadence?

Choose how often shifts rotate so people can plan life and managers can forecast skills coverage.

  • Weekly
  • Biweekly
  • Monthly
  • Quarterly
  • No rotation

Overtime & Extra Hours

Use an overtime availability poll to confirm who can extend hours or add a shift. Clear limits help you cover spikes without burning people out.

  • When to use these polls: Before busy periods, after call-outs, or when projects slip and timelines compress.
  • Best poll types for this section: Single-choice for willingness, sliders or ranges for capacity, and checkboxes for days.
  • How to act on the results: Allocate overtime fairly, track acceptance rates, and rotate opportunities to maintain equity.
Overtime Willingness

Are you available for overtime this week?

Instantly identify who’s open to extra hours so you can stabilize the schedule fast in Poll Maker.

  • Yes
  • No
  • Maybe
  • Depends on day
Capacity Extra hours

Maximum overtime you can take this week?

Right-size requests by matching extra hours to what people can realistically deliver.

  • 2–4 hrs
  • 5–8 hrs
  • 9–12 hrs
  • 13+ hrs
  • None
Shift Length OT block

Preferred overtime block length?

Choose the most sustainable chunk of extra work to maintain quality and safety standards.

  • 2 hours
  • 4 hours
  • 6 hours
  • Full shift
  • No preference
Days OT timing

Which days are best for overtime?

Direct OT toward days with the highest demand while respecting personal constraints.

  • Weekdays
  • Saturday
  • Sunday
  • Any day
  • Not available
Notice Lead time

How much notice do you need for overtime?

Set fair expectations on lead time to reduce declines and last-minute scrambles.

  • < 2 hours
  • Same day
  • 24 hours
  • 48+ hours
  • Prefer not to say
Health Double-back

Are you comfortable with a close-open (double-back)?

Confirm compliance and comfort levels before scheduling any back-to-back coverage.

  • Yes
  • Sometimes
  • No
  • Policy restricts
Holiday OT Peak pay

Interest in holiday overtime?

Identify volunteers for premium periods and plan incentives transparently. Export results to finalize allocations.

  • High
  • Medium
  • Low
  • Not available
  • Depends on rate
Fairness Assignment

Preferred method to assign overtime?

Choose a fair system that balances opportunity, skill, and urgency—then publish the rules in advance.

  • Voluntary sign-up
  • Seniority
  • Round-robin
  • Manager assigns
  • Mix of methods

Shift Swaps & Backfill

Keep the system flowing with a clear shift swap poll. Clarify who can step in, what approvals are needed, and how to backfill gaps without drama.

  • When to use these polls: Any time a conflict pops up, or proactively to maintain a live swap board.
  • Best poll types for this section: Multiple-choice to confirm options, and short text for context when necessary.
  • How to act on the results: Match qualified volunteers, record approvals, and update the schedule in one go.
Swap Shift B cover

Who can swap into Shift B?

Post an open shift and quickly identify qualified teams to pick it up. Load this swap template into Poll Maker in seconds.

  • Front Desk
  • Warehouse
  • Kitchen
  • Sales Floor
  • Tech Support
  • Something else
Reason Context

What’s the reason for this swap?

Gather just enough context to prioritize approvals and maintain fairness without oversharing private details.

  • Appointment
  • Family
  • Transport
  • Sick
  • Other reason
  • Prefer not to say
Fit Role match

Swap preference for role matching?

Define acceptable swaps up front to keep quality and safety standards intact during coverage changes.

  • Same role only
  • Any qualified
  • Higher pay only
  • Same hours
  • Manager decides
Approval Governance

What approval is needed for a swap?

Make the approval path explicit to speed decisions and prevent misunderstandings later.

  • Manager only
  • Peer + Manager
  • Team lead
  • No approval
  • Depends on shift
Timing When

Swap timeframe you can accommodate?

Set boundaries on timing so volunteers know what’s realistic before offering to help.

  • Today
  • Tomorrow
  • This week
  • Next week
  • Not available
Flex Partial swaps

Are you open to a partial shift swap?

Partial swaps can unlock coverage without major changes—capture preferences ahead of time.

  • Whole shift only
  • First half
  • Second half
  • Flexible
  • No
Backfill Coverage mode

Best way to backfill an uncovered shift?

Agree on a default backfill approach so managers can resolve gaps consistently and quickly.

  • Overtime
  • Split shift
  • Temp staff
  • Move workload
  • No backfill needed
Visibility Swap board

Who should see open swap requests?

Set the right visibility so you get enough volunteers without oversharing sensitive details. Load and share via Poll Maker.

  • Entire team
  • Manager only
  • Team leads
  • Direct peers
  • Don’t mind

Holidays, Weekends & Rota Planning

During peak periods, a simple rota poll clarifies coverage early and prevents crunch-time reshuffles. Confirm willingness, rotations, and communication channels.

  • When to use these polls: Before seasonal peaks, when planning company events, or anytime fairness and notice matter most.
  • Best poll types for this section: Single-choice to lock commitments, checkboxes for options, and short text for constraints.
  • How to act on the results: Publish rules, assign equitably, capture exceptions, and share the final plan in one place.
Holiday Coverage

Can you work on [Holiday]?

Secure holiday coverage early and set fair expectations for who works and who banks time off.

  • Yes
  • No
  • Early only
  • Late only
  • Maybe
Weekend Rotation

Preferred weekend rotation?

Balance lifestyle needs with service levels by agreeing a rotation pattern everyone understands.

  • 1 in 2
  • 1 in 3
  • 1 in 4
  • Weekends only
  • Never weekends
PeakSeasonal plan

How can you help during peak weeks?

Choose the most sustainable way to add capacity without harming quality or wellbeing.

  • Extra days
  • Extra hours
  • No change
  • Time off
  • Depends on pay
Notice Freeze rules

Minimum rota freeze notice you need?

Lock change deadlines to reduce churn and ensure everyone can plan around the schedule.

  • 24 hours
  • 48 hours
  • 72 hours
  • 1 week
  • 2+ weeks
Comms Release day

Best day to release the weekly schedule?

Pick one reliable release day to reduce anxiety and keep planning predictable. Export results to standardize practice.

  • Friday
  • Saturday
  • Sunday
  • Monday
  • No preference
Trade Time-in-lieu

Would you trade a holiday shift for time off later?

Clarify if time-in-lieu is valuable so you can offer the right incentives during peaks.

  • Yes
  • Possibly
  • No
  • Depends on rate
  • Prefer not to say
Planning Season count

How many holiday shifts can you do this season?

Estimate total holiday coverage to plan rotations and avoid over-reliance on a few people.

  • 0
  • 1
  • 2
  • 3+
  • Unsure
Communication Channel

How do you want your schedule delivered?

Agree on a single source of truth for schedules to reduce missed updates and confusion. Load in Poll Maker and share instantly.

  • App notification
  • SMS
  • Email
  • Printed board
  • Any of the above

Frequently Asked Questions

Below are practical answers to help you design, launch, and interpret a staff availability poll with confidence—whether you’re planning a weekly rota, coordinating swaps, or covering holiday peaks.

What is the fastest way to run a staff availability poll each week?
Reuse a standard template, limit to 1–2 questions, and share by the same day and time each cycle. With Poll Maker you can clone last week’s poll, update dates, and send in under a minute.
How many options should I include for time slots?
Keep options scannable on mobile—4 to 8 slots per question. If you need more detail, split into separate polls (e.g., weekday vs weekend) rather than one long list.
When should I use single-choice vs checkboxes?
Use single-choice when you need a firm decision (e.g., “Can you cover Saturday?”). Use checkboxes when multiple selections are valid (e.g., “Which shifts can you work next week?”).
Can staff respond anonymously?
Yes, but for scheduling you typically need identifiable responses to assign shifts. Consider anonymous polls for policy feedback, and named polls for availability and swaps.
What’s the best cadence for a shift scheduling poll?
Weekly is common. For stable teams, biweekly can work. During peak seasons or rapid change, run quick daily checks for high-risk days.
How do I avoid bias and ensure fairness?
Publish clear rules (rotation, limits, notice windows), alternate premium shifts, and use poll data to document decisions. Share summaries so everyone sees the rationale.
How should I interpret “Maybe” responses?
Treat “Maybe” as soft capacity: keep these as backups, confirm with a follow-up message, and set a deadline to convert to Yes/No before publishing the schedule.
What if I manage multiple locations or teams?
Include a location selector in your availability poll, or run one poll per site. Filter results by team so you can reassign coverage across locations if needed.
How do I use the results to improve future schedules?
Track patterns (preferred shifts, no-shows, overtime limits) and adjust assignments accordingly. Export results, tag constraints, and build a repeatable scheduling playbook.
What’s a good way to communicate final assignments?
Pick one authoritative channel—app, SMS, or email—and stick to it. Send the schedule at the same time each week and include a clear cutoff for changes.

Keep questions clear and concise: one intent per poll, 4–6 options, and language your team uses daily. Offer balanced choices with realistic “No,” “Maybe,” and “Something else” options to capture nuance without friction. Use results to make better decisions by sorting for critical coverage first, then layering in preferences and fairness rules. Document how you assign premium shifts, holidays, and overtime so everyone trusts the process. Remember: every poll on this page can be created and launched in seconds using Poll Maker for free—clone, tweak, share, and export to finalize your schedule with confidence.

Make a Free Poll